Site Groundworks and Levelling

  • 01483smg
  • Sep 27, 2025
  • 1 min read

Using our small excavator in combination with laser levelling systems, we prepared the ground for a new internal stable complex installation. The barn had been used an open area for wintering horses, so our first task was to remove the deep layer of manure and dispose of it. We then imported several lorry loads of chalk for the hardcore base. Our machine operator then distributed the hardcore and levelled out with the laser equipment.


We then installed the temporary timber formwork ready for the concrete and over a period of 3 days we poured the concrete into each of the three sections. We engaged local contractors to assist pouring and levelling the concrete.


Groundworks, Chalk Hardcore delivery and site levelling with excavator
Hardcore delivery, levelling and timber formwork
Concrete base for stables
Site levelling with laser system
First section poured and levelled
First section poured and levelled
New indoor equine stable installation
Installation of new indoor stables begins
Second side of stabling installed, nearly there!
Second side of stabling installed, nearly there!

Quality indoor horse stable install
Installation complete, now a few bits of finishing off and ready to go